We have achieved great things

Water

Groundwater flow model Potsdam-Mitte

Project details

  • Focal points: Groundwater modelling
  • Duration since 2021
  • ProPotsdam GmbH
  • Contents:
    1. Expert assessment of the possible influence of the planned construction projects on the groundwater conditions in interaction with the existing buildings.
    2. Evaluation of the construction of several underground car parks as part of the urban development of the "Staudenhof and surrounding area of the Bildungsforum, taking into account existing buildings" site.

SIMILAR PROJECTS

Central Station-Magdeburg "Ernst-Reuter-Allee"
Jänschwalde large-scale hydrogeological model
Wind farm Krummensee 3 - Hydrological report for early CEF measure