We have achieved great things

Soil

Supplementary Detailed Investigation of the Contaminated Site Risk of the Hastedter Osterdeich Property in Bremen

Project details

Period:2017-2019
Field of activity:Orienting investigation of contaminated sites, detailed investigation, supplementary detailed investigation
Scope of services:Soil, soil air and groundwater investigations on the suspected contaminated site of a former transformer station in connection with several contaminated sites in the immediate vicinity
Short description:Before the Second World War, a roofing felt factory was located in the area of the study site and the neighbouring property to the east, which burnt down completely in 1938.In the area of the Hastedter Osterdeich property, a total of two areas of damage were localised, which can be differentiated into a central and a southern input area.In addition to considerable PAH contamination, high concentrations of CHC and BTEX were detected in the soil and groundwater. In the course of several investigation steps, the source areas were roughly localised and delimited, including detailed investigation of the contaminant plume in the groundwater downstream.

SIMILAR PROJECTS

Versmannkai East, site clearance BF 102-110
Conversion of the former BW Hospital Rostrup, Bad Zwischenahn
Orientation investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen