NEWS

The Nachterstedt large-scale hydrological model

Social Media Post Template 11 scaled 1

[et_pb_post_title title="off" meta="off" featured_image="off" admin_label="Das hydrologische Großraumodell Nachterstedt
 
" _builder_version="4.6.6″ z_index_tablet="500″][et_pb_text admin_label="Das hydrologische Großraumodell Nachterstedt
 
" _builder_version="4.7.7″ module_alignment="left" custom_padding="||0px||" hover_enabled="0″ z_index_tablet="500″ box_shadow_horizontal_tablet="0px" box_shadow_vertical_tablet="0px" box_shadow_blur_tablet="40px" box_shadow_spread_tablet="0px" sticky_enabled="0″]

The Nachterstedt large-scale hydrological model

 "The rehabilitation of the Nachterstedt opencast mine after the 2009 slope movement - causes, planning, results", a publication of the LMBV - Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH (page 76 - 83 ).

Click here to download the PDF: https://www.lmbv.de/index.php/Publ_Mitteldeutschland.html?file=files/LMBV/Publikationen/Publikationen%20Mitteldeutschland/Allgemein%20MD/LMBV_Fachpublikation-Nachterstedt_20201012_Web.pdf  

The effort with which the LMBV (our client) is advancing the design and protection of the post-mining landscape in Central Germany is exemplified by the high professional and technical level.

The collected contributions summarise the measures taken to cope with the 2009 embankment event. This project was unique for all involved and is unsurpassed in its complexity.

M&P Group employees are proud to have been involved in the management of the 2009 embankment event.

The successful planning and implementation of the project required effective cooperation and communication between the LMBV and a large number of engineering service providers from different disciplines of engineering and geosciences, authorities as well as executing companies with specialisation in the fields of subsoil improvement, special civil engineering, earthworks and civil engineering, well construction, etc. The project was carried out in close cooperation with the LMBV.

For the cause research of the landslide event, for the rehabilitation planning of the slopes and for the mining law approval procedure, a complex groundwater flow model was set up by IBGW GmbH. The programme system PCGEOFIM, which was especially developed for the montane hydrological requirements, was used, in which the progressing opencast mine rehabilitation works, the flooded opencast mine lakes as well as the changing water balance components due to the recultivation measures are taken into account. For a qualified description and prognosis of the groundwater recharge caused by mining, the entire water balance, including the surface runoff, is reproduced via a coupling with a soil water balance model.

With expertise, innovation and know-how from the region and Germany, we are shaping a future worth living together.

Principle representation of a groundwater model (left) and the consideration of lakes (right)

Picture (aerial view) of this article: Peter Radke/LMBV 

#mullandpartner #engineeringforabettertomorrow #whatwedo #news #IBGW ##PCGEOFIM

Our business areas

Environmental and geotechnical engineering
Construction and project management
Renewable energies
Real estate development
Infrastructure
Water management

Our companies

M&P Engineering Company
M&P Engineering Company Munich
T&P Beratende Ingenieure
P&P Real Estate Consulting
P&B Real Estate Management
P&M Project Management
M&P Umwelttechnik

Please contact us

To the contact form

 Follow us on

Icon LinkedIn

 

Imprint & Data Protection